In mid-June 2026, Central Oregon's water regulators did something nobody on record had seen them do before. They shut off junior water rights on the stretch of the Deschutes River between Bend and Redmond, mid-season, because there was not enough natural flow left in the river to protect the senior rights ahead of them. One of Oregon's worst water years in recent memory forced state regulators to curtail junior water rights between Bend and Redmond for what officials believe is the first time, with water regulators shutting off all junior diversions to protect senior instream water rights because of a lack of natural flow in the Deschutes River, according to Deschutes Basin watermaster Jeremy Giffin.
If you are buying or selling irrigated acreage anywhere near Redmond right now, that single fact changes the conversation you should be having before you sign anything. The listing sheet tells you acreage, home size, and whether the property has water rights at all. It does not tell you the one number that decided who kept water this summer and who didn't: the priority date on that right.
The Date That Just Became the Most Important Line on the Deed
Oregon water law runs on prior appropriation, a doctrine that sounds like a formality until a year like this one arrives. The first person to obtain a water right on a stream is the last to be shut off in times of low streamflows, and in water-short times, the water right holder with the oldest date of priority can demand the water specified in his or her water right without regard for the needs of junior users. That is not background theory anymore. It is what just happened on the ground between Bend and Redmond.
The season didn't start out looking catastrophic. In early April, Wickiup Reservoir was at 93% capacity and effectively full, the highest it had been in several years. By the end of June, the picture had inverted. This winter's snowpack melted out by the beginning of June, and the river was running with about a third less water than in a typical year, while Wickiup Reservoir, which many irrigators depend on to get through the summer, dropped to less than half its capacity by the end of that same month. A full reservoir in April told buyers nothing about what August would look like.
The underlying cause was a snowpack collapse without precedent in the modern record. Snowpack in the Upper Deschutes-Crooked Basin dwindled to just 6% of normal by May 1 and was completely gone by June 1, with water-year precipitation since October 1 measuring only 78% of normal. Statewide, snowpack melted out at the earliest date on record, tying 2015, while forecasts suggested summer streamflows would rank among the lowest 15% of historical records at most locations.
Ask any Central Oregon Irrigation District (COID) patron and you'll get the same read. "I think it will be the worst drought on record," said Craig Horrell, general manager of Central Oregon Irrigation District, the largest district in the county. A property's priority date decided whether that forecast turned into a curtailment notice or stayed someone else's problem.
The Forfeiture Clock Nobody Explains at Closing
Priority date is only half the picture. The other half is whether the right stays alive at all, and that depends on beneficial use.
Water rights that have not been used in five consecutive years are subject to forfeiture, and the district is specific about what counts. Irrigation of native vegetation such as sagebrush, bunchgrass, or cheatgrass is not beneficial use of an irrigation water right. A pasture that's been neglected, or a parcel that's sat unirrigated while a prior owner waited to sell, can be quietly burning down its own forfeiture clock without anyone noticing on the listing.
Here's the part that should change how you read a Redmond acreage disclosure packet: the beneficial use history remains with the property and does not reset with new ownership. If the seller let the right sit idle, the buyer inherits that history, clock and all. In a normal year, that's a slow-moving risk you can verify with a records request. In a year when a chunk of the district got curtailed mid-season through no fault of the landowner, the honest question to ask before closing is whether that involuntary gap counts against the five-year window, and to get that answered in writing rather than assumed.
The drought also reached property owners who don't irrigate a single acre. Central Oregon Irrigation District implemented a 3.5% assessment rate increase in early 2026 to offset declining hydropower revenue driven by low snowpack. The district bills for the infrastructure whether or not the water gets used. If a property carries water rights, the assessment shows up on the annual cost of ownership regardless of what happens in the field.
The Canal Is About to Disappear, and That Changes What You're Actually Selling
There's a second story running underneath the drought, and it's arguably the more permanent one for Redmond-area acreage.
A draft environmental review evaluates a proposal to pipe and pressurize approximately 18.5 miles of the district's Pilot Butte canal from NE 17th Street in Redmond to the diversion point on the Deschutes River in Bend, an open canal built in 1905 that delivers irrigation water to thousands of acres across Central Oregon but loses significant amounts of water each year to seepage through the region's porous volcanic soil. The preferred alternative includes installing 10 to 11 foot diameter pipe, upgrading 60 turnouts to pressurized delivery systems, with construction occurring over three years and a total estimated cost of about $356.6 million.
This isn't a proposal stuck in early planning. A 7.9-mile stretch of the canal from Redmond to Smith Rock has already been piped, and in 2024 a $25 million federal grant administered through the Deschutes River Conservancy was awarded to help pipe an additional section near Redmond. The remaining stretch is now moving through federal review on a defined public timeline:
| Milestone | Timing |
|---|---|
| Draft EIS & Notice of Availability | Winter 2026 |
| 45-Day Public Comment Period & Open House | Winter 2026 |
| Final EIS Notice of Availability | Summer 2026 |
| 30-Day Public Review Period | Summer 2026 |
| NRCS Public Record of Decision (NEPA Complete) | Late Summer / Early Fall 2026 |
That last milestone, per the project's public timeline, falls within the next couple of months from today. Any Redmond-area acreage listing with canal frontage should have an answer ready for whether that parcel falls inside the affected 18.5-mile stretch, and if so, what the district expects for construction sequencing on that segment.
Here's the piece most listing descriptions get backward. For years, open canal frontage was the romantic feature: cottonwoods along the ditch, the sound of moving water, the sense of a working landscape you could photograph. Once a segment gets piped, that visual is gone, replaced by a buried line and a pressurized turnout box. For a lifestyle buyer who wanted the picture, that's a real loss and it belongs in the pricing conversation before the segment goes underground, not after a buyer notices it missing on a walkthrough.
But for the buyer who actually irrigates pasture or waters horses, pressurized delivery solves problems that open ditches never did. No more checking headgates, no more losing half the flow to seepage before it reaches the field, no more maintenance on a hundred-plus-year-old earthen channel. Due to its porous bottom, the canal experiences around 150 cubic feet of water per second of losses, equivalent to roughly 50,000 acre-feet of water per year. A working buyer priced that loss into their planning without ever writing it down. Piping removes it.
The two buyers want opposite things from the same infrastructure change, and a parcel's position relative to the piped corridor tells you which buyer it will actually suit.
What to Verify Before You Sign, Whichever Side of the Table You're On
Oregon disclosure law puts the burden on the seller to surface facts that affect a property's value, and a pending canal piping project or a curtailment history clearly qualifies. Before an offer goes in or a listing goes live on Redmond-area acreage, get specific answers to a short list of questions:
- What is the irrigation district, the account status, and the priority date on the water right, and did this specific parcel experience any curtailment during the 2026 season?
- Has the water right been used in each of the last five years, and can the seller document that history?
- Does this parcel sit within the 18.5-mile segment under EIS review, and if so, what does the district's current timeline say about construction on that stretch?
- What has the annual COID assessment run over the past few years, and does that reflect the recent rate increase?
None of these show up as a line item on a standard MLS sheet. All four determine what the property is actually worth to irrigate, and what it will cost to hold.
A Few Questions Worth Asking Directly
Does this affect acreage outside the immediate Redmond corridor too? The curtailment specifically affected junior rights between Bend and Redmond, but the drought conditions were basin-wide. As of mid-June 2026, Tumalo Irrigation District was delivering about 70% of normal supplies with Crescent Lake deliveries expected to stop in mid-August, and Arnold Irrigation District had already exhausted its natural flow supply, with stored water expected to run out by early July. Any Deschutes County acreage with a water right deserves the same priority date and beneficial use questions, regardless of which specific district serves it.
Will piped water increase what a parcel is worth? It depends entirely on the buyer. A working equestrian or ranch buyer who values reliable pressure will see real upside. A buyer who was drawn to the visual of an open ditch will see a tradeoff. Neither answer is universal, which is exactly why it needs to be discussed property by property rather than assumed from a market average.
Where do I find the actual water rights record for a specific parcel? Start with the Oregon Water Resources Department's water rights records, and request the district's own account history directly. A seller's disclosure statement should reference both.
Redmond acreage has always been sold on acres and views. This year it's being decided on a line most buyers never used to read. If you're weighing a purchase or preparing to list irrigated land near Redmond and want someone who has already run these questions down with COID, priority dates, and the Pilot Butte timeline in hand, Karen Wilson can walk the specifics of your parcel with you. Schedule a Private Consultation before your next offer or listing agreement goes out the door.